After overhead line damage: Train traffic in Munich resumes.

The trains are now running again at a standstill in Munich Central Station.
Foto: Elke Richter / dpa
Nach der massiven Beschädigung der Oberleitungsanlage am Münchner Hauptbahnhof rollt der Zugverkehr dort langsam wieder an. Das teilte die Deutsche Bahn am späten Donnerstagabend mit: »Züge des Fern- und Regionalverkehrs können den Hauptbahnhof wieder anfahren.«
The repair work progressed faster than expected. However, there will still be significant disruptions with delays and train cancellations in the evening, it was reported.
On Friday, long-distance and regional transportation is expected to resume mostly as usual. However, there might still be a few train cancellations in the morning.
„The S-Bahn traffic on the main line will remain significantly restricted until late at night,“ the Deutsche Bahn announced. The S-Bahn trains are expected to resume regular operations on the main line at the start of service.
Bagger beschädigt Oberleitungen
According to initial findings, a digger damaged a complete crossbeam structure that spans the overhead lines across all tracks of the Munich-Laim area during construction work for the second S-Bahn trunk line. As a result, the route between the main station and Munich-Pasing was shut down.
Der Fern- und Regionalverkehr sowie der Verkehr auf der S-Bahn-Stammstrecke der Landeshauptstadt wurden mit wenigen Ausnahmen komplett eingestellt. Der Münchner Hauptbahnhof konnte lange nicht angefahren werden. »Die DB entschuldigt sich ausdrücklich für die Unannehmlichkeiten bei ihren Fahrgästen«, hieß es.